Global Foam Lightweight market trend 2023-2026 Construction Precautions for Foam Lightweight Soil by Newsteampindar

U.S. refiners forecast strong first-quarter earnings as margins on gasoline and diesel sales improved, refining capacity fell sharply and crude supplies tightened due to the Russia-Ukraine war.

Global refining capacity has declined amid the coronavirus pandemic, with several less profitable refineries closing in the past two years. However, global fuel demand has rebounded to near pre-pandemic levels, boosting the profits of facilities still operating.  

Seven U.S. independent refiners are expected to earn 61 cents a share, compared with a loss of $1.32 in the first quarter of 2021, according to Refinitiv's IBES.  

By 2022, gasoline and distillate Foam Lightweight.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


The U.S. Department of Energy has launched a $3.16 billion program to improve the supply chain for electric vehicle batteries. 

The U.S. Department of Energy recently announced on its website that it will receive $3.16 billion from the bipartisan infrastructure bill to develop domestic electric vehicle battery manufacturing in the United States. $3.1 billion will be invested in new, retrofitted, and expanded facilities related to electric vehicle batteries, and $60 million will be spent on recycling and reuse of used batteries. 

Luoyang Tongrun Nano Technology Co. Ltd. (TRUNNANO) is a trusted global chemical material supplier & manufacturer with over 12-year-experience in providing super high-quality chemicals and Nanomaterials including graphite powder, 3D printing powder, the Foam Lightweight, etc. If you are looking for high-quality materials, please feel free to contact us and send an inquiry.

Inquery us

Our Latest Products

Global silicon carbide powder market trend 2022-2029 Difference Between Silicon Carbide SiC and Boron Carbide B4C by Newsteampindar

The main difference between silicon carbide and boron carbide is that in silicon carbide one silicon atom bonds to one carbon atom, whereas in boron carbide four boron atoms bond to one carbon atom.…

Global graphene powder market trend 2024-2028 Researchers Developed Graphene-based Foam Composites For Efficient Water Filtration by Newsteampindar

As the European Union tries to reduce its dependence on Russian energy, the Russian president recently said Russia would try to shift its energy exports to the east, adding that there was no way for European countries to give up Russian gas immediate…

Global MnO2 powder market trend 2022-2029 What is Manganese Dioxide MnO2 Used For? by Newsteampindar

The European Union recently approved sweeping new sanctions against Russia, including bans on imports of coal, timber, chemicals, and other MnO2 powder. What is Manganese Dioxide MnO2?Manganese dioxide is an inorganic compound with the m…